Particle Board Kitchen Cabinets
Quotations depend on the dimensions, quantity, materials, hardware and agreed delivery scope. Share the floor plan and specification so the team can prepare a project-specific proposal.
300%
Better Moisture Resistance
50-70%
Cost Savings
720kg/m³
High-Density Core Construction
12-20 Years
Expected Lifespan with Proper Care
high standards
HubersCasa vs Standard Particle Board
Material choices are reviewed for appearance, use and destination requirements. Relevant sourcing and compliance documents should be confirmed with the project team.
Four complementary production bases in Nanjing, Chuzhou, Quanjiao and Linyi provide 90,000㎡ of combined manufacturing space for panel and paint-finished furniture.
HubersCasa Particle Board
- High-Density Fiberboard (HDF) core
- Moisture-resistant resin system
- Professional melamine coating
- Complete edge sealing protection
- Eco-friendly recycled wood construction
Standard Particle Board
- Lower density construction
- Basic adhesive systems
- Limited surface protection
- Minimal moisture resistance
- Non-sustainable virgin wood materials
Key Product Advantages
Superior Dimensional Stability
The 2026 product catalog brings together ten living spaces, coordinated materials, selected real projects and the full process from inquiry to after-sales.
Why This Matters:
Every project begins with the floor plan, room dimensions, preferred style and daily routines. The agreed brief guides the layout, storage and finish selection.
- No seasonal warping or expansion
- Doors remain perfectly aligned
- Consistent hardware performance
- Long-term structural integrity
Consistent Quality
Four complementary production bases in Nanjing, Chuzhou, Quanjiao and Linyi provide 90,000㎡ of combined manufacturing space for panel and paint-finished furniture.
Easy Installation
Factory trial fitting checks structure, drilling, hardware and gaps before packing. Protective packing and clear labeling support overseas shipping and installation.
Professional Grade
Quotations depend on the dimensions, quantity, materials, hardware and agreed delivery scope. Share the floor plan and specification so the team can prepare a project-specific proposal.
Environmentally Responsible Choice
Production drawings, bills of materials and approved finishes are checked together before manufacturing, helping the delivered furniture match the confirmed design.
Environmental Impact:
Four complementary production bases in Nanjing, Chuzhou, Quanjiao and Linyi provide 90,000㎡ of combined manufacturing space for panel and paint-finished furniture.
100%
Low-VOC
Advanced Material Technology
High-Density Core (720-750 kg/m³)
Material choices are reviewed for appearance, use and destination requirements. Relevant sourcing and compliance documents should be confirmed with the project team.
Moisture-Resistant Resin System
HubersCasa supports project supply, dealer programs and OEM / ODM manufacturing, with sample kits, showroom support and coordinated marketing materials.
Particle Board Kitchen Cabinets Design
Ideal Applications
When to Choose Particle Board Cabinets
Project documentation can include contracts, invoices, packing lists and destination-specific declarations. Requirements are confirmed before shipment.
Budget Renovations
Rental Properties
Starter Homes
Maintenance & Longevity
Daily Care Requirements
- Clean with mild soap and warm water
- Dry surfaces immediately after cleaning
- Address spills promptly to prevent staining
- Use cutting boards and trivets to protect surfaces
Annual Maintenance
- Inspect edge sealing for wear or damage
- Tighten hardware connections as needed
- Check and adjust door alignment
- Ensure adequate kitchen ventilation
Expert Guidance
More Faqs about Particle Board Kitchen Cabinets
Factory trial fitting checks structure, drilling, hardware and gaps before packing. Protective packing and clear labeling support overseas shipping and installation.
The coordinated range includes kitchen cabinets, wardrobes, bathroom furniture, living and dining cabinetry, interior doors and wall panels.
Share the floor plan, site measurements and preferred style. The team develops the layout, storage plan and production drawings for confirmation before manufacture.
The catalog includes 18mm multilayer plywood and moisture-resistant particle board options, with painted, veneer and panel finishes. Confirm the final specification for your project.
Prices depend on room dimensions, quantities, materials, hardware and delivery scope. Send the drawings and specification for a coordinated quotation.
The English catalog describes a typical 45–85 day production period. The agreed specification, quantity and confirmed schedule determine the final lead time.
Production drawings and bills of materials guide manufacture. Trial fitting checks the construction, drilling, hardware and gaps before protective packing and labeling.
The brochure describes a five-year structural and two-year hardware warranty, subject to the confirmed project agreement and product specification.
Contact Mr. Chen by phone or WhatsApp: +86 133 8200 7880. Share your drawings, destination and preferred project schedule.
20+ years of manufacturing experience · 180,000+ homes furnished · 60+ destinations

Wanlin Fu Residence

Phnom Penh Luxury Villa

Phnom Penh Luxury Villa

Suning Elegant Mansion

Evergrande Golden World Villa

Wanlin Fu Residence
How to Cooperate With Us It’s Simple!
Kitchen construction options include 18mm multi-layer plywood or moisture-resistant particle board, with the final specification agreed for the destination and project.
Detailed Enquiry & Drawing
Choose from a broad selection of surfaces and finishes, including painted finishes, veneer, panel finishes and coordinated doors and wall panels.
Design & Approval
Quotations depend on the dimensions, quantity, materials, hardware and agreed delivery scope. Share the floor plan and specification so the team can prepare a project-specific proposal.
Customization & Manufacturing
Four complementary production bases in Nanjing, Chuzhou, Quanjiao and Linyi provide 90,000㎡ of combined manufacturing space for panel and paint-finished furniture.
Logistics & Installation
Factory trial fitting checks structure, drilling, hardware and gaps before packing. Protective packing and clear labeling support overseas shipping and installation.
Kitchen cabinetry is planned around the room, cooking routines and storage needs. Choose coordinated layouts, materials, hardware and finishes, supported by production drawings and a confirmed specification.
- Free 3D Design
- 20+ years of manufacturing experience · 180,000+ homes furnished · 60+ destinations
- 80000㎡ Factory Plant
- 20+ years of Experience
- Export documentation and delivery terms confirmed for each destination.
- Factory trial fitting checks structure, drilling, hardware and gaps before packing. Protective packing and clear labeling support overseas shipping and installation.
GET A FREE QUOTE FOR YOUR PROJECT | HubersCasa
Typical production planning is 45–85 days, depending on the confirmed specification, quantity and schedule. Delivery arrangements are agreed for each order.



